![Api rp 17n download](https://kumkoniak.com/1.jpg)
Drafts of revised 17J and 17B documents had successful API ballots between August 16 and September 30. Expected duration of the JIP is 2.5 years in length. 3 contracts out of the 5 needed to kick-off the JIP are signed. The ongoing JIP for the update of API 17TR2 “The Ageing of PA-11 in Flexible Pipes” is ongoing with 5 participants. Ed Baniak made the presentation on behalf of Krassimir Doynov. The Task Group report (Attachment E) was submitted. API 17B, API 17J & API 17K-Flexible Pipe and API 17L1 & API 17L2-Ancillary Equipment for Flexible Pipe i. The target is for issuing a draft for ballot and comment before the API Summer Standardization Conference. It was recommended that the CSOEM Materials Group may need to get involved. The Materials Section is the section most wrought with conflicts with other API documents. The Work Group Draft includes a complete new rewrite of Section 6 on Materials. It is estimated that approximately 50% of the document has been formally reviewed and addressed (excluding Annexes). Document is currently under revision the SC 17A Task Force has met twice in 2013. The Task Group report (Attachments D1 and D2) was given by John Upchurch. The liaison report from Subcommittee 18 was provided by Ed Baniak (Attachment C). Corrections were noted to be incorporated by Ed Baniak. The updated SC17 Voting Representation Listing was updated (Attachment A1), the API Work Group Leads Contact List was presented (Attachment A2) and the Standards Status Matrix (Attachment B) were reviewed. A motion was made, seconded, and passed to approve the minutes. The 2013 Summer Standardization Meeting draft minutes of Jin Washington DC were reviewed. External Pressure (API 17TR11, API 17TR12) c. Details to the upcoming BSEE/Industry workshop on January 28 and 29 in New Orleans were given by John Bednar. API SC17 will have (6) papers presented at an OTC session on Wednesday, May 7. NOTE: It is the voting member’s responsibility to attend the committee meetings or to notify, via e-mail, the SC17 Leadership and API SC17 Coordinator of your proxy! 3. A roll call was completed and confirmed there was a quorum of 17 present (15 voting members and 2 Proxy) for this meeting. John Bednar, API SC17 Chairman, welcomed the group to the meeting at 8:00 AM with opening remarks, outlining various safety/housekeeping issues, and agenda review. API SC 17 Subsea Production Equipment 2014 Winter Meeting Houston, Texas JanuJohn Bednar, Chair Gary Hurta, (Co) Vice Chair Brian Skeels, (Co) Vice Chair Ross Frazer (Co) Vice Chair John McManus, Secretary 1.
![Api rp 17n download](https://kumkoniak.com/1.jpg)